RiverRail 2024

Lake Erie & Southern

RiverRail Header Image
Great Northern — Mesabi Division
Michigan Central

Lake Erie & Southern An HO Scale Railroad by Ron Copher

Lake Erie & Southern

Set in mid-1960, the Lake Erie and Southern (LE&S) is a freelance Granger road operating in down-state Illinois.

The modeled LE&S Illinois division includes the 1st district between South Anderson Yard to Alton and St.Louis. (550 ft.) also the 3rd district between South Anderson thru Peoria to Spring Grove yard(LE&S) and Creve Croeur(NYC). (525 ft.). Active staging at both ends of the St. Louis line and staging for the P&PU RR at Creve Croeur along with Spring Grove Yard supply the railroad with traffic. Eight passenger trains, and a assortment of freight extras (in CTC territory all trains run on signal indication regardless of superiority or class) are operated over the division. Operating positions include a 2 dispatchers, South Anderson yardmaster with a eastend, westend and a depot job switch engines at South Anderson yard, a yardmaster with a switch crew at Alton, IL., a footboard yardmasters at Peoria and Nathanburg plus eight to ten road crews. Operating sessions are 4 hours long not including a 30 minute break in the middle. Normal operating is 16 to 20 operators. The layout dimensions are 29 ft. by 65 ft. Stairs to the basement. The restroom is downstairs

The Lake Erie and Southern Railroad uses Digitrax’s control system with UT4R Radio throttles all locos with working lights and some sound. The LE&S is full CTC operation on the St. Louis District and the Peoria District.. The Dispatchers is located in a separate room containing the 2 US&S Centralized Traffic Control machines and communications are by block phones. The Peoria District also has the NYC operating with trackage rights on the LE&S from Mayfeild Jct. to Bridge Switch.

Railroad Details

Superintendant: Ron Copher
Interchange Railroads: NYC / CB&Q / Monon / C&EI / IC / P&PU
Locale: Indiana, Illinois
Era: Mid-1965
Scale: HO
Layout Size: 29 x 65 Double Deck
Control System: Digitrax DCC
Dispatching Method: CTC
Car Routing: Car Cards / Waybills
Crew Size: 12-16
Listed Jobs: 2 Dispatchers, 3 Yardmasters, 3 Yard Switchers, 10 Road Crews
Session Length: 4 Hours
Communications: Telephones

Location Details

Accessibility: Stais to Basement
Pets: 2 Small Dogs
Distance from Hotel: 16 Miles
Estimated Travel Time from Hotel: 24 minuites
HomeFrequently Asked Questions
©2025 RiverRail, All Rights Reserved